Instrumentation Tubing Services

Scroll Down

JLE Instrumentation Tubers are highly experienced in all aspects of stainless steel tubing, valving, regulators, hydraulic and pneumatic control panels; and can assist with new fit outs, upgrades, extensions or projects.
Competent and trained, our technicians hold gas detection, confined space, Bosiet and Permit to work. JLE Tubing Services can also work in conjunction with our Electrical and Mechanical Trades.

Tubing / Seamless piping / Stainless Steel

Joining / Bending / Fitting

New lines / Upgrades / Hydraulic & Pneumatic control panels

Design, Testing & commissioning

Pressure Testing and Leak Testing

JLE tubers are Swagelok certified

Process Plants

Onshore

Offshore

Vessels

Oil and Gas

Ballance lab tubing
Yellow Tubing in outdoor plant

Chemical Injection

JLE install and design injection systems for chemical dosing of wellheads and process lines in oil and gas and laboratory environments.

Ballance lab tubing

Hydraulic Tubing

JLE design and install hydraulic tubing for heavy machinery and oil exploration projects. We work internationally, onshore and offshore.

Waikato tubing

Pneumatics / Compressed Air

JLE design control valve pneumatics for instrumentation, for the operation in precision instruments and control systems.

The trusted choice in the industrial and infrastructure sectors, delivering electrical and mechanical solutions through collaboration with our Aotearoa and international partners.

jle holdings ltd

"Corporis dicta eaque sequi autem suscipit. Dolores asperiores sunt tempora ipsa pariatur aut consectetur corporis quia. Minus maxime option. Corporis dicta eaque sequi autem suscipit. Dolores asperiores sunt tempora ipsa pariatur aut consectetur corporis quia. "

NAME - COMPANY NAME

I want to thank you very much for your effort and sacrifices; being instrumental in getting this Wellhead hook-up done. It is a pleasure to work with such a professional and competent team.

Norbert Harder - Superintendent
-
Worley

A short note to say a big thank you to you and all others in the safe and timely completion of work over the last 6-7 days, and of course the planning and preparation leading up to site-based work.

Paul Fougere - Upstream Project Manager
-
Todd Energy

I would like to thank JLE for the work you have done for us in the Ngawha OEC 4 Geothermal power plant. JLE have delivered a perfect and well executed installation that was required and essential for this Ormat power plant . The transparency and communication during the execution was great, and contributed to the project success. I am sure we will join forces again very soon. Thanks, Shay Lehman - Project Engineer

Shay Lehman - Project Engineer
-
Ormat Technologies

The event was a success, delivered safely with the critical path activity delivered on time and the event on budget. JLE Mechanical and EI disciplines certainly played a part in the outcome.

TA 2019
-
Ballance Agri-Nutrients
Waikato tubing

Related Projects