JLE was awarded the contract to supply and install electrical works for the Mangere Wastewater Treatment Plant Digester Area. The contract included installing cable systems, terminations, distribution boards and commissioning of the installed electrical works. JLE helped contribute to a project that was completed on-time, within budget and with zero LTI’s.