
Tegel Feedmill Stage 1, 2 & 3 Upgrades
JLE New Plymouth was tasked with upgrading an existing operating Feedmill to bring it up to current electrical hazardous area standards.
Services
Electrical
,
Mechanical
,
Location
Taranaki, New Zealand
Client
Tegel Foods Ltd
Project team size
4
Project duration
11 month rollouts
This plant required extensive rewiring and equipment replacement requiring the project to be completed in stages and is currently ongoing. The first stage included a new 1.5MVA power supply, new main switchboard and switch room. Ongoing stages included the relocation of power supplies and the upgrade of equipment and controls to meet the hazardous area requirement of a zone 21/22 installation. This project was carefully planned and executed to ensure there was no loss of production for the client. JLE also supplied all mechanical and fabrication services required for this project.
Features
Get in touch
Contact us to discuss how JLE can support your next industrial build.
Contact Us
