Waingongoro Pipe Bridge Replacement
JLE were awarded the contract to supply and install the replacement stainless steel pipework to span the new bridge built by Downer.
Services
Mechanical
,
Fabrication
,
Location
Taranaki, New Zealand
Client
Downer NZ
Project team size
5
Project duration
4 months
This involved the workshop fabrication, spooling, site installation, pressure testing and commissioning. The project was completed with zero LTI’s.
Features
Get in touch