Te Mihi Geothermal Power Project

The 2 x 83 MW Te Mihi Geothermal Power Plant is located within the Te Mihi Area of the Wairakei Geothermal Steam-Field.

Services
Instrumentation
,
Electrical
,
Mechanical
,
Location
Taupo, New Zealand
Client
McConnell Dowell
Project team size
85
Project duration
12 Months

JLE was contracted by MSP JV to install 7000m of primary cable ladder rack, complete the building services installation, install over 200,000m of Low voltage cable and the associated Switchboards, Motor Control Centre and Distribution Boards. The contract also includes installation of Instrumentation including impulse lines and piping bridals. The client has a lot of safety protocols on site including "home without harm, everyone every day" and "look after your mate," which incorporates well with JLEs own safety system ZERO. JLE completed this project with no LTI's or MTI's on site

Features
No items found.
No items found.
No items found.
Get in touch

Contact us to discuss how JLE can support your next industrial build.

Contact Us
CTA Banner