
Tangihoe Pump Station Reliability Project
JLE mechanical fabricated a platform which sits 4 meters above ground level to allow for flooding events.
Services
Mechanical
,
Fabrication
,
Instrument Tubing
,
Electrical
,
Location
Taranaki, New Zealand
Client
Fonterra Cooperative
Project team size
15
Project duration
3 months
Raising the height of all power and control equipment was a main objective of this project. JLE won the scope for this project for the Mechanical, Electrical & Automation – a true indication of the diversity of the Taranaki team and JLE’s multi-disciplined capabilities.
Features
Get in touch
Contact us to discuss how JLE can support your next industrial build.
Contact Us
