State Highway 20A
JLE completed the installation and commissioning of a Trench Sump for MHX Alliance as part of the SH20A upgrade between the Auckland Airport and Western Ring Route (SH20 and SH16).
Services
Instrumentation
,
Electrical
,
Fabrication
,
Location
Auckland, New Zealand
Client
MHX Kirkbride Allliance
Project team size
5
Project duration
12 weeks
The contract was multidisciplinary and the scope of work entailed Mechanical (Piping and Handrails), Automation, Electrical, instrumentation and Control, in a Hazardous Area Environment. Mechanical fabrication took place in JLE’s Hawera branch, whereas Electrical, Control, and Automation services were provided from the Auckland Office. This project has been a great success with zero MTI’s and LTI’s.