
EC5 Ammonia Upgrade
JLE Mechanical were consulted to fabricate and install 5x King valves to be incorporated into the EC5 Ammonia system at Fonterra.
Services
Mechanical
,
Fabrication
,
Instrument Tubing
,
Location
Taranaki, New Zealand
Client
Fonterra Cooperative
Project team size
10
Project duration
8 months
The purpose of these valves was to enhance the safety system and automate an emergency shut down of the EC5 system. The entire system required to be vacated and was pumped out into purpose-built storage Isotainers in order to complete this installation. This job was undertaken with tight deadlines during the winter period requiring over 2500 hours to complete the project.
Features
Get in touch
Contact us to discuss how JLE can support your next industrial build.
Contact Us
