Todd Energy Compressor Station
Worley Parsons contracted JLE to complete the electrical and instrumentation installation works at Todd Energy’s Mangahewa Expansion Compression Project (MEC).
Services
Electrical
,
Instrumentation
,
Location
Taranaki, New Zealand
Client
Worley
Project team size
10-Jun
Project duration
9 months
This work was based at the McKee production station in Taranaki. JLE‘s involvement in this project included supply and installation of the main electrical switch room which was constructed on-site at JLE New Plymouth’s workshop then transported to the site. Site-based activities included installing cable systems, power and control wiring, supply, installation and calibration of all instrumentation and chemical dosing tubing, completion of quality assurance documentation, and hazardous area electrical inspections. JLE completed this project with zero LTI’s.