Mangere Waste-water Treatment Plant
JLE was awarded the contract to supply and install electrical works for the Mangere Wastewater Treatment Plant Digester Area.
Services
Electrical
,
Location
Auckland, New Zealand
Client
Watercare Services Ltd
Project team size
5
Project duration
1.5 months
The contract included installing cable systems, terminations, distribution boards and commissioning of the installed electrical works. JLE helped contribute to a project that was completed on-time, within budget and with zero LTI’s.