About Hero

Asahi Boiler

JLE was engaged by Windsor Energy to carry out electrical installation of a Steampac Water Tube boiler at Asahi brewery in Papakura Auckland.

Services
Electrical
,
Location
Auckland, New Zealand
Client
Windsor Energy
Project team size
6
Project duration
3 months

Windsor’s WT boilers are continually enhanced by incorporating the latest advancements along with carefully selected working components from reputable partners, achieving very high levels of reliability at low operating costs. Steampac Water Tube boilers are designed in New Zealand. Due to ongoing relationship developed over the years with Windsor Energy, JLE was successful in completing the electrical and instrumentation work on this boiler in a timely and collaborative manner. Our site staff worked in partnership with Windsor Energy staff to implement design changes, complete the physical works, supply materials and assist with commissioning. JLE’s ongoing commitment to health and safety delivered a project with zero LTI’s and MTI’s.

Features
No items found.
No items found.
No items found.
Get in touch

Contact us to discuss how JLE can support your next industrial build.

Contact Us
CTA Banner