Tegel Feedmill Stage 1 & 2

Client: Tegel
Project Value: $1.35M
Size of Project Team: 6
Project Duration: 18 months
Lost Time Injuries: Zero

Project Description
JLE New Plymouth was tasked with upgrading an existing operating Feedmill to bring it up to electrical hazardous area requirements. This plant was not at an acceptable level of electrical compliance and required extensive rewiring and equipment replacement. This project was completed in stages and is currently still ongoing. The first stage included a new 1.5MVA power supply and main switchboard and switch room. Ongoing stages included the relocation of power supplies to the new supply and the upgrade of equipment and controls to meet the hazardous area requirement of a zone 21 /22 requirement. This project was executed without loss of production for the client. JLE also supplied all mechanical services and fabrication required for this project.