Client: Tegel Foods
Project Value: $2,000,000
Size of Project Team: 15
Project Duration: 5 months
Lost Time Injuries: 0

Project Description
JLE was engaged by Tegel Foods to do the electrical work for the upgrade of the existing Table Talk plant in Henderson. This expansion entailed an all-new processing area, hanging bays, plant install, refrigeration, blast freezer, and site services. This was a greenfield site behind the existing Table Talk plant. This included all new power supplies, transformers, main switchboards, and all new Linco chicken processing equipment, conveyors and product handling. JLE installed all power and lighting and processing plant. This also included an extensive project for offal handling. JLE was also involved in stage 2 development which was the addition of the further processing facilities. Both of these were a significant design and build project direct for Tegel Foods. JLE did this work on the back of their experience with several upgrades to the Tegel Foods New Plymouth factory over the last 20 years. JLE was also involved in the Dury hatchery upgrade and the relocation of equipment from the old Manurewa site.

Projects

20K

projects completed

286

Happy customers

12

Awards received

30

years in service

Building Better Lives

JLE is a privately-owned New Zealand industrial and commercial contracting business. leading New Zealand Electrical and Mechanical Contractor, with operating branches in several key locations around New Zealand, Australia and New Guinea.

SAFETY

Scroll to Top