Te Mihi Geothermal Power Project

Te Mihi Geothermal Power Project

Client: MSP JV
Size of Project Team: 85
Project Duration: 12 Months

Project Description
The 2 x 83 MW Te Mihi Geothermal Power Project is located within the Te Mihi Area of the Wairakei Geothermal Steam-Field. The project Owner is Contact Energy Ltd with owns and operates the steam-field and Wairakei Power Station which is sited just North of Taupo, New Zealand.
JLE was contracted by MSP JV to install 7000m of primary ladder rack, complete the building services contract, and install over 200,000m of Low voltage cable and the associated Switchboards, Motor Control Centre and Distribution Boards. The contract also includes installation of Balance of Plant Instrumentation including impulse lines and piping bridals. The client has a lot of safety protocols on site including “home without harm, everyone every day” and “look after your mate,” which incorporates well with JLEs own safety system ZERO. JLE completed this project with no LTI’s or MTI’s on site.

Projects

20K

projects completed

286

Happy customers

12

Awards received

30

years in service

Building Better Lives

JLE is a privately-owned New Zealand industrial and commercial contracting business. leading New Zealand Electrical and Mechanical Contractor, with operating branches in several key locations around New Zealand, Australia and New Guinea.