Tangihoe Pump station reliability Project

Client: Fonterra 
Size of Project Team: Fifteen
Project Duration: 3 months
Lost Time Injuries:0
Year: 2019

Project Description
JLE  mechanical fabricated this platform which sits 4 meters above the ground level to allow for winter flood levels. Raising all power and control equipment was the main intention of this project. JLE won the entire scope for this project including  Mechanical, Electrical & Automation – a true indication of the diversity of the Taranaki team and JLE’s multi-disciplined capabilities.