State Highway 20A

State Highway 20A

Client: MHX Kirkbride Alliance
Size of Project Team: 5
Project Duration: 12 weeks
Lost Time Injuries: Zero

Project Description
JLE has recently completed the installation and commissioning of Trench Sump for MHX Alliance as part of the SH20A upgrade between the Auckland Airport and Western Ring Route ( S H20 and SH16 ) . The contract was multidisciplinary, as the scope of work entailed Mechanical ( Piping and
Handrails ) , Automation, Electrical and Control, within a Hazardous Area Environment. Mechanical fabrication took place in JLE ’ s Hawera branch, whereas Electrical and Control, and Automation services were carried out of the Auckland Office. This project has been a great success
with zero MTI ’ s and LTI ’ s.