Rotorua Waste Water Treatment Plant

Client: Downer EDI Works Ltd
Project Value: $205,000.00
Size of Project Team: 5
Project Duration: 8 months
Commencement: 2011
Lost Time Injuries:0

Project Description
JLE was contracted by Downer EDI Works Ltd to install cable trays and ladder racks, run control and supply power cables to the low pressure / high volume air pumps as well as the pump control station which has automated controls for the aerobic settling ponds at the Rotorua Waste Water Treatment Plant. Throughout the project, JLE assisted in the implementation of a number of design changes.
J
LE’s ongoing commitment to safety delivered a project with zero LTI’s and MTI’s.

Projects

20K

projects completed

286

Happy customers

12

Awards received

30

years in service

Building Better Lives

JLE is a privately-owned New Zealand industrial and commercial contracting business. leading New Zealand Electrical and Mechanical Contractor, with operating branches in several key locations around New Zealand, Australia and New Guinea.