Ongas Bottleswap Facility

Project Description

Client: Cassidy Construction
Size of Project Team: 15
Project Duration: 8 months
Lost Time Injuries: Zero

The electrical, instrumentation and automation works for the new Ongas Bottling Facility in South Auckland has very recently been completed by JLE. The initial contract was signed with Cassidy Construction at $1.25 million, however JLE were requested to complete some substantial additional packages of work which added over a million dollars to the original contract value.

JLE were required to complete this additional work in the original contracted time frame which meant we had to increase the site team numbers significantly and work long hours over an extended period. Many of the additional crew were mobilised from our Taranaki branch showing the versatility of JLE in being able to provide extra resources on projects when and where our customers require.
JLE spent almost 15,000 man hours on this project with no LTI’s which was a testament to the site team given the long working hours on the project.

Scroll to Top