Newcrest Mining contracted JLE to fabricate piping and structural steel for a new HFO line from its HFO tanks to the diesel power station at their gold mining operations in PNG. The piping and structural steel was fabricated at our partner workshop in China. The entire process of shop drawings, fabrication, testing, painting, loading out and MDR preparation was overseen by one of J LE’s mechanical supervisors who was stationed in China full time to ensure the required quality, safety and program expectations were achieved.
| Client | Newcrest Mining |
|---|---|
| Location | Papua New Guinea |
| Project Value | $145,000 |
| Size of Project Team | |
| Project Duration | 3 months |
| Lost Time Injuries | 0 |
| Completion | 2016 |