Newcrest Mining contracted JLE to fabricate a duplex (SAF 2205) tank for the slurry system at their gold mining operations in PNG. The 5 metre diameter by 6 metre high tank was fabricated at JLE’s mechanical workshop in Hawera, South Taranaki. It was fabricated in one piece and transported to PNG on specially made cradles.
| Client | Newcrest Mining |
|---|---|
| Location | Hawera |
| Project Value | $270,000 |
| Size of Project Team | |
| Project Duration | 4 months |
| Lost Time Injuries | 0 |
| Completion | 2015 |