JLE was contracted by Downer EDI Works Ltd to install cable trays and ladder racks, run control and supply power cables to the low pressure / high volume air pumps as well as the pump control station which has automated controls for the aerobic settling ponds at the Rotorua Waste Water Treatment Plant.
Throughout the project JLE as-sisted in the implementation of a number of design changes. JLE’s ongoing commit-ment to safety, delivered a project with zero LTI’s and MTI’s.
| Client | Downer EDI Works Ltd |
|---|---|
| Location | Rotorua |
| Project Value | $205,000.00 |
| Size of Project Team | 5 |
| Project Duration | 8 months |
| Lost Time Injuries | |
| Completion | 2012 |